Note to Team leaders from Don:
A quick phone call to 561-310-9902 to sign up for google docs is best. Local area chairs can send me a list of names and emails to make sure everyone is signed up. Every email has to have an account open and accessible to google Docs. Thanks in advance for your help. don@floridamasonry.com

Note to Team leaders from Joyce:
Please be sure to use the new spreadsheet posted on google docs that was reviewed at the last teleconference to record your area's bucket listing breakdown. Remember to record details from any conversions on the bottom of the page. I will continue to track Bucket #3 details on your blogs, if you include me in your team e-mails. Should you need additional comments added to your areas below, please forward to me at joyce@floridamasonry.com

Tampa 3-8-2010
Lisa Pelham lisa@a1block.com cell 813-784-1973
Message:
March 8 Teleconference- Complete
March 29 - 8:30 AM

Completed 10 Projects in February. L&L were held on March 17 (Bucket #2) GLE & Assoc. /Fire Station and March 30 (Bucket #3) St. Petersburg Police Department. No decision made on the project. Introduced masonry awards program. Firm designs in both tilt and masonry.

Called on architectural firm Forum Architects-multifamily housing. Designed previously in wood. One of the pending projects that was designed in wood/Sable Park Apartments/conversion.

Teleconference emphasized bucket three project appointments. Allison has an L&L set in Orlando on Wednesday, March 31st with Don Beers for a Bucket #3 and there are about 4-5 Bucket #3 projects that are in the process of setting appointments. Lisa Pelham assigned new projects for March for both Polk/Tampa. Projects were reassigned that had no activity from team. There is a L&L scheduled in Orlando that Lisa is facilitating on March 17. 2 other projects/Allison Willmeng and Bob Pietro that are pending for L&L's. Lisa reassigned projects from inactive members to those on the teleconference. Some team members continue to be challenged by google docs. Dave Luebs is participating through CSI and networking responsibilities and is working on a Pasco County School Board project. Continued conversation on BIM modeling and interface with masonry in the Tampa/architect role. Request for sample commercial comparison to use in promotion.

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKIKNG:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en


Other promotional activities
Dave Luebs plans to use his new Scholarship Committee position to meet the right folks at USF and keep masonry in front of them. The MCAF Tampa Bay chapter has for many years handed out 2 $1,000 scholarships to deserving students as selected by our local committee annually. The student must be enrolled in the USF School of Architecture.
Follow-up 3-3-2010 Bob DiPietro 813-299-3801 2-10-2010 spoke with John Holt of Reynolds / Smith / Hill regarding Ritchie Elemetary (Pasco County School). He is very interested in listening to us. The project is currently in master planning and premature for an accurate CMU cost comparison based on the current drawings. This is RSH first Pasco School project and is interested in looking at cost comparisons between CMU and tilt-up. Pasco School Board decisions on past schools to go tilt-up was strictly cost driven. mailto:bdipietro@fsscompany.com.

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en



Southwest 3-15-2010
Shelly Honsberger shonsberger@titanamerica.com 941-915-2035
Message: March 9-prior to teleconference-Complete

Projects for month have all been assigned/7. Committee is currently active. Danielle Larson will be setting bucket #3 appointments for the SW. Shelley is working with AIA for a June 2nd and/or 3rd breakfast meeting with several architects participating for CEU credits. Additionally scheduling meetings for the Victor Christian Church project, Lemon Bay school and FGCU college projects.

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en



Southeast/Miami 3-2-2010
Greg Strickland GStrickland@cemexusa.com 561- 239-0386
Teleconferences: 1-866-756-1914 Pass code 6489663
Message:
13 new Projects-1 qualified. 131 total/51 qualified. Gaining momentum. 11-Bucket#3. March 10th L&L Miami project from February. FIU/Stempel Complex Bucket #3-Perkins & Will. Working on committing new members including a an additional committee chair and members for the Miami area.

Local Meeting has been postponed; too many people on vacation and lack of responses. Will try again at a later date. Updates requested for conference call on Monday, April 5th – on this call, all the progress of each team member is addressed and the project tracking scorecard is updated.

New project assignments from February, 2010 have been delegated. There are still many prior months unqualified projects. The SE and Miami tabs which each names highlighted in yellow under column “N”. The columns that need to be filled in on each project are highlighted in green:

Bucket Number, Column “D”
Entry Date, Column “O”
ProMasonry Comment & Follow Up, Column “P”

Our main goals are to contact every project and determine which bucket they fall into. On bucket 3’s, since a structural wall decision has not been made, they need the most attention – our goal there is to set up an appointment to discuss masonry. Project's on hold will be determined to be “dead” or just on “hold”. If it’s on hold, a good time frame to follow up again (6 months, 1 year, etc).

BUCKET 1 – IS MASONRY OR LIKELY TO BE MASONRY
BUCKET 2 – ALREADY DESIGNED OR WILL BE DESIGNED IN OTHER THAN MASONRY (STEEL, WOOD, TILT)
BUCKET 3 – NOT DECSION ON THE STRUCTURAL WALLS HAS BEEN MADE
BUCKET 4 – THE PROJECT IS EITHER DEAD OR ON HOLD

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en

Treasure Coast 2-25-2010
Dave Pfeffer dpfeffer@titanamerica.com 561-239-1400
Message: Meeting 3-18 prior to MAF meeting

Non-Bucket Project L&L was cancelled and will be rescheduled with a high profile project. Meeting scheduled with Suffolk for mid-April. Bob Irish is scheduling a meeting with AIA chapter. 1 bucket #2 , 2 bucket #4 active project for area. In process for AIA group presentation. Shawn McGee with Oceanside has been prepped and will participate in the teleconference in Dave Pfeffer's absence. The West Palm Beach College Campus expansion has a meeting set up for the 17th with the contractor, subcontractor, engineer of record and our team including Don Beers, Oceanside Masonry and Dave Pfeffer. Anticipating a 'win'. Other project, Boy Scout camp is on hold.

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en



Central/Orlando 2-15-2010
Bill Parsons bparsons@pyramidmasonry.net 407-816-5740 Ext. 13
Message: March 17-5:00 PM prior to General meeting

12 Projects are in the process of being assigned. Participation of team members on google docs is sporatic. Rocky will discuss a group meeting and will be adding some new committee members.

All team members should have their google account established. The list for January 31, 2010 has been distributed to all: Andrew Ryan, Charles Wallin, Don Zuhr, Jay Snyder, Lenny Faulkner, JohnRehrer, Ronnie Blom, Chris Bettinger, Wally Dayem with a plan to make the calls and update the google docs prior to our next Promasonry reporting conference call on March 9th. Refer to Google Docs for recent activity. Strong consideration to “cold calling” the architectural firms scheduling “lunch & learns” for any masonry topic in addition to trying to get a dialog going about a specific project to a specific person.


VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en


Northeast 3-3-2010
Paul Riversmailto:Riversprivers@castcrete.com 386-527-5674
Message:
4 projects 1-qualified bucket #4. Other activity- Meeting April 6th/L&L with Don Beers at NEFBA/AIA meeting Engineers, architects and builders/approximately 22 in attendance/representing 4-5 firms. Promotion of masonry certification workshop. 'Lunch and Learn' on Tuesday, March 16th with VRL Architects at Noon. VRL's office is located at 6501 Arlington Expressway, Ste 101. Don Beers will be doing 'Moisture Prevention in Masonry Construction' presentation for CEU credits with VRL. Cold calls on other local architects will be included with L&L's. Additional members are being added to team and being coordinated with Rocky Jenkins.

VIEW STATUS:
http://spreadsheets.google.com/ccc?

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=enkey=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

Northcentral/Tallahassee 3-5-2010
Kem Magnant magnantk@vmcmail.com 229-630-4235
Message/Tallahassee: Meeting with two sales reps in Tallahassee and will be reviewing projects for status. Discuss forming sub-committee in that area. Gary Shuard and Sam Pickenpaugh/Vulcan for job information.

Message/Gainesville:
Alachua Co. F&G Elementary/Bucket 2. Set up L&L set up for April 22nd set up scheduled to be tilt which is on Don's calendar for a conversion. Projects are on-hold for a short period. Looking at current prototype for tilt-up. Very interested in hearing from Masonry industry. Goal to get a meeting set up/UF Conference center on the 22nd.

The North Central Pro Masonry group held their meeting yesterday afternoon March 17, at 2:30 pm.Attendees: Wes Simmons, Don Beers, Joyce Rivas, Chip Sykes, Thomas Moss, Kem Magnant, Jim Allen. Anti-trust statement was passed around and all members are familiar with the documentKem handed out the current project list and newly added projects were discussedNew projects were divided and people were assigned to make the calls.Current bucket 3 projects were discussed and contacts were assigned for follow up.Wes Simmons volunteered to contact Ponikvar Architects and try to schedule a meeting and/or lunch & learn. Ricardo Cavallino about speaking at the AIA meeting. Chip will contact UF about current projects and to try and set up a meeting. Thomas had information about a current project on the list. Next meeting will be held at 3:00 on April 14th.

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en



Northwest/Panhandle 2-5-2010
Jeff Gamel jeff@specblockusa.com
Message:

VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en


Westcentral/Ocala 3-5-2010
Brian Fulcher bfulcher@cemexusa.com 321-431-2442
Message: 3 February projects 2 qualified. 1 project pending. Heather Island Market Center and will be developed. Currently slated to contain an Auto Zone and Murphy's auto center.
Jeff Colebrook, Paul Micali and Lance Hill are part of the Ocala team. Revisiting October, November and December projects.


VIEW STATUS:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdEp1YzVmM1B5ajBYc1R4Vkx1S1hUY1E&hl=en

VIEW JOBS TRACKING:
http://spreadsheets.google.com/ccc?key=0Anc38JbPrq3jdGkwYkUzcVZJc1phZkduQWc1NXZwNEE&hl=en







No comments:

Post a Comment